Ancillary facilities
The following is an introduction of Incheon International Airport's ancillary facilities.Terminal 2 treated water supply facility construction
Project overview/Facility scale
Incheon Airport is building facilities for treating wastewater (sewage) that occurs in the northern part of the airport from extension of Terminal 2 and for supplying treated water.
Water treated through such facilities are recirculated and used as toilet water, coolant for machinery, and gardening water, and any remaining treated water is sent through the detention basin and discharged into the sea.
Classification | Details |
---|---|
Processing Area | Northern area of the airport (T2 and surrounding areas, IBC-III) |
Facility Capacity | 20,000㎥/day (706,293.33 ft3 /day) |
Aircraft fuel storage facilities and pipeline construction
Project overview/Facility scale
Fuel storage tanks and supply pipes will be installed to provide aircraft fuel to the aprons newly built in the phase 4 construction and facilitate smooth airport operation.
Classification | At Present | Phase 4 | Total |
---|---|---|---|
Fuel Tanks | 12 | 4 | 16 |
Fuel Pipes | 64㎞ (40mile) |
17㎞ (11 mile) |
81㎞ (50 mile) |